404 Not Found

404 Not Found

The requested URL was not found on this server. Sorry for the inconvenience.
Please report this message and include the following information to us.
Thank you very much!

URL: http://home.ijjnews.com/system/2017/03/24/010991156.shtml
Server: localhost.localdomain
Date: 2017/11/20 23:09:15

Powered by Tengine 404 Not Found

404 Not Found

The requested URL was not found on this server. Sorry for the inconvenience.
Please report this message and include the following information to us.
Thank you very much!

URL: http://home.ijjnews.com/system/2017/03/24/010991156.shtml
Server: localhost.localdomain
Date: 2017/11/20 23:09:15

Powered by Tengine
您当前的位置 : 晋江新闻网  >  家居频道  >  家装资讯
家装课堂:教你如何合理安排装修时间
www.ijjnews.com     来源:海南日报     2017-03-24 17:30      我来说两句
  

  家庭装修时,业主通常会把大量的精力放在家装设计和主材购买上,却忽略了装修时间的合理安排。这种情况容易导致装修期间不足而焦头烂额,或者因为工程延期而增加总体的装修费用。

  房屋装修过程可分为三个阶段:前期、中期和后期。

  目前,房屋装修前期主要是装修设计,从选定装修公司到确定设计方案大概需要10-15天。在这段时间里,顾客要选好装修所用主要材料,尤其是瓷砖和橱柜。因为橱柜一般都是定制的,需要20—35天才能完成。专业橱柜设计师还要根据实际情况对厨房进行设计,如确定水电路的位置,以便开工后及时进行水电改造。瓷砖是开工后最先用到的材料,所以在装修前期,一定要先选好橱柜和瓷砖。

  装修中期主要是施工期。开工后,水电工和木工先进场施工,水电路改造需要4天到一周的时间,木工做吊顶、背景墙、现场制作的柜子等需要15天左右。大约7天后,水电路改造完成,瓦工开始进场铺瓷砖,先铺厨房和卫生间,最后再铺公共部分,整个过程持续到30天左右。第15天左右,木工完成工作,油工开始进场,进行墙体刮腻子找平、木作和墙面的刷漆等工作,要持续到装修完工前两三天。在这段时间里,您可以到市场上找找自己喜欢的家具,为以后的装修确定风格。

  以上施工完成后,剩下的就是装修的后期工程,这时离装修完工还剩两三天的时间,木工要回来安装窗帘杆、五金挂件等。在厂家订购的地板、门、洁具、橱柜等也开始陆续安装,还要进行厨房和卫生间的吊顶,这些工作比较简单快捷,每种只需1天左右时间,全部完工共需3天左右。

标签:家装|装修
责任编辑:陈子汉陈子汉

【已有位网友发表了看法】打印收藏此页关闭

请您文明上网、理性发言并遵守相关规定。
你至少需要输入 5 个字    昵称:       
404 Not Found

404 Not Found

The requested URL was not found on this server. Sorry for the inconvenience.
Please report this message and include the following information to us.
Thank you very much!

URL: http://home.ijjnews.com/system/2017/03/24/010991156.shtml
Server: localhost.localdomain
Date: 2017/11/20 23:09:15

Powered by Tengine